Auren Energia · Wind energy · Engineering design

Lifelines and anchorage for wind turbines

Field survey, calculation memorandum, and technical drawings for vertical lifelines and anchorage points at the Alto Sertão II wind complex.

Role: Responsible engineer and author of the calculation memorandum.

2025Alto Sertão II · Bahia
Fieldwork at the wind-turbine nacelle.
Fieldwork at the wind-turbine nacelle.
The challenge

From observation to technical assessment.

Assess vertical access and anchorage arrangements in wind-turbine towers, connecting field conditions with documented design assumptions.

Approach

  • Survey of tower access, lifeline components, and anchorage arrangements.
  • Calculations for vertical lifeline loads and evaluation of anchorage configurations.
  • Technical drawings and a calculation memorandum defining the scope and conditions of use.

Deliverables

Calculation memorandum, technical drawings, and technical-responsibility documentation (ART).

Engineering contribution

A documented engineering basis connecting site conditions, calculations, and the specified use of the system.

Responsible engineer

Pedro Leonardo Oliveira da Costa.

Project photographs

The work in pictures.

Contact

Let’s discuss your next project.